In November 2022 FESCO, Ltd. trial tested a 7 1/16” 15K STD x STD HYD frac valve from an industry partner on a customer’s wellsite to determine the efficacy of the claim the valve does not need to be greased during frac operation.
Download PDFNo-Grease Frac Valve Case Study #1
Pipeline pigging: how the right program improves integrity and throughput
The line is still moving product, but it is taking more pressure to push the same volume it moved last quarter. Nobody has changed the compression or pumping setup. The setpoint keeps creeping up anyway. The first instinct is to look at the station. Often the problem is somewhere else, sitting inside the line where [...]
Slickline vs. Wireline: The Intervention Design Decision Most Teams Overlook
“Wireline” is one of the most routinely misused terms in completion and intervention planning. In field conversation, it gets applied to any wire-conveyed service, whether slickline, electric line, or braided line, regardless of the technical distinctions that determine which one belongs in a given well program. That imprecision is harmless in general conversation. In an [...]

