FESCO’s successfully pumped 1,100+ stages with the FracMaster Greaseless Valve in the Permian, Haynesville and Eagle Ford Shale from NOV2022 – APR2023. May 2023 – FESCO RU Greaseless Frac Stacks and Zippers on a two-well Delaware Basin pad to continue confirmation of the technology’s efficiencies, and verifying the functionality of the valves during a complete frac without grease injection and zero damages post-job. All claims were confirmed. As a result, FESCO immediately rigged-up on a four-well pad for the same customer with the same excellent results.
Download PDFGreaseless Frac Valve Case Study #2
Pressure Control Failures in Completion Operations
Pressure-control failures in completion operations rarely originate from a single defective component. They develop through layered weaknesses across mechanical interfaces, instrumentation, and verification practices inside the pressure envelope. In high-pressure, high-rate completions, frac stacks, trees, flowback equipment, sand management systems, and pipeline tie-ins must function as one pressure-control system. When verification is incomplete or fragmented, [...]
No-Grease Frac Valve Case Study #1
In November 2022 FESCO, Ltd. trial tested a 7 1/16” 15K STD x STD HYD frac valve from an industry partner on a customer’s wellsite to determine the efficacy of the claim the valve does not need to be greased during frac operation.