Petroleum engineering services company FESCO - Petroleum Engineering Services, Production Testing and Reservoir Engineering Services
Production Testing since 1949!
Fesco Inc. - Petroleum Engineering Services production testing, hydrocarbon laboratory, slickline services, reservoir engineering, pvt laboratory, frac flowbacks, capillary tubing, pipeline pigging, hydraulic chokes safety, hydrocarbon laboratory, production testing, slickline services, reservoir engineering, pvt laboratory, frac flowbacks, capillary tubing, pipeline pigging, hydraulic chokes About FESCO Petroleum Engineering Services Company Log into ClientServ System Contact FESCO Inc.
Petroleum engineering services picture
  Production Testing   Reservoir Engineering   Capillary Tubing
  Hydrocarbon Laboratory   PVT Laboratory   Pipeline Pigging
  Slickline Services   Frac Flowbacks   Hydraulic Chokes
Join the FESCO email list
Name:
Email Address:
Company:
manage your account

 

Pipeline Pigging
pipeline pigging
Pressure control manifold and jumbo separator used to separate produced effluents during pipeline pigging operations.

Pipeline Pigging Separator

Pipeline Pigging Control Manifold

Separator :
  • Max WP = 1250 psi
  • Gas Capacity = 300 MMscf/d (at 1000 psi)
  • Liquid Capacity = 20000 BL/d
 
Control Manifold:
  • Max WP = 1500 psi
  • Dual-Chokes (2" ID or 3" ID) with 6" ID bypass

 

Visit the SynergyMP website.
© 2004-2007 Fesco, Ltd.  - All Rights Reserved     Home  |  Services  |  Newsletter  |  Privacy Policy  |  Contact Us